MP2 Log


MP2 Log 11/8

Work Started:
- I started working on my plan of procedures

Work completed:
- I did not complete any work

Reminders:
- No reminders


MP2 Log 11/10

Work Started:
-Lists for plan of procedure
-Plan of procedures

Work Completed:
-Lists for plan of procedures

Notes:
-Don't forget to add pictures to plan of procedures
-Contact Kevin


MP2 Log 11/15

Work Started:
- Plan of Procedures

Work Finished:
-Diagram of wires and connections

Notes:
-Finish the plan of procedures before it is too late


Log MP2 11/17

Work Started:
-N/A

Work completed:
-N/A

Notes:
-I am still in the middle of my plan of procedures.


MP2 Log 11/22

Work Started:
-N/A

Work Completed;
-N/A

Notes:
-Still on my plan of procedures, almost done.


MP2 log 12/1

Work Started
-What to buy list

Work Completed
-Plan of procedures
-What to buy list

Notes
- Next class, buy everything that is needed using debit card


MP2 log 12/6

Work Started
- Building process

Work Completed
- I have finished drilling holes in the film canisters

Notes
- Will be waterproofing motors soon

MP2 log 12/8

Work Started
- Motor waterproofing

Work Completed
- Wire connections and taping

Notes
-  Save wax for other groups

MP2 log 12/15

Work Started
- Waxing motors

Work completed
- Waxing motors

Notes
- Will start soldering next class

MP2 log 12/20

Work Started
- DPDT switch soldering

Work Completed
- DPDT switch soldering

Notes
- Next step is creating control box

MP2 log 12/22

Work started:
-  Building the control box

Work completed
- Finished soldering all of the switches

-Next step is putting the control box together.

MP2 log 1/3

Work Started:
- Putting switches in control box
- Connecting propellers

Work Completed
- Putting switches in control box
- Control box finished
Notes:
-  none

MP2 log 1/5

Work Started:
-  Motor mounting
-  Running tether

Work Completed:
-  Running tether

Notes:
- Camera will need to bee waterproofed a different way.

MP2 log 1/10

Work Started
-Camera waterproofing

Work finished
- Motor mounting

Notes
- Motors mounted a different way from developmental work

MP2 log 1/12

Work Started:
-Camera mounting

Work completed:
-Camera waterproofing
-Camera mounting

Notes:
-New design for up/down motors possible